Most people build a yard in the order they think of things. Lawn first, because bare dirt is ugly. Then a patio a year later. Then sprinklers, once dragging the hose gets old. Each new job tears up part of the last one. There is a better order, and it is the same whether you do everything in one season or spread it over several years.
Start with a plan for the whole yard
You do not have to build it all at once. You do need to know where everything will go. Sketch the yard from above and mark the parts you want in the end, even the ones that are years away. The drawing on our home page is a quick way to think it through: start with bare dirt and add a lawn, beds, a patio, a shade tree, lighting and watering, one at a time.
With a plan, each job can leave room for the next one.
Step 1: Clear and grade
Take out what is not staying. Then shape the ground. The soil should slope gently away from the house so water does not sit against the walls, and low spots that collect water should be dealt with now. Grading moves a lot of soil, so it has to come before anything you want to keep.
Step 2: Hard surfaces
Patios and walkways come next. They need digging, gravel, and often a machine and many wheelbarrow trips. All of that would ruin a new lawn. The edges of the patio also set the lines for everything around it.
Step 3: Lines under the ground
Before you cover anything, think about what has to run under it.
- Pipe for sprinklers and drip
- Low-voltage cable for garden lights
- Empty sleeves under paths and patios, so a pipe or cable can be pulled through later
A sleeve is a short length of pipe laid under a hard surface. It is very little work during the build and saves lifting pavers later. If you plan lights or watering some day, put the sleeves in now.
Step 4: Trees
Trees go in early for two reasons. They take the longest to grow, so every year counts. And planting one means a large hole and a heavy root ball, which is hard to get across a finished lawn. Place a shade tree where its shade will fall on your sitting area in the afternoon, and keep it clear of the house, the fence and buried lines.
Step 5: Beds and shrubs
Shape and edge the beds, improve the soil and plant. Lay the drip tubing through the beds as you go and cover it with mulch. Beds along a fence are easier to reach before the lawn is in.
Step 6: Sprinkler heads
The main pipes went in earlier. Now the sprinkler heads are set at the final height of the soil and adjusted to cover the lawn area evenly.
Step 7: Lawn
Lawn goes in last. Everything that could damage it is done. The soil is raked smooth one final time, and sod is laid or seed is sown. The watering system is already there to keep it damp while it takes root.
Step 8: Lights and finishing touches
Light fixtures are set along paths and in beds and connected to the cable you laid earlier. Mulch is topped up, edges are tidied and the timer is set.
If you are doing it in stages
The same order holds. A few tips help.
- Do the grading and the patio in the first stage if you can. They are the hardest to add later.
- Plant trees early, even if the rest waits.
- Put sleeves under every hard surface.
- If lawn has to go in before something else, keep a clear route for a wheelbarrow from the gate to the area still to be built.
- Keep your plan and mark on it where pipes and cables run.
Common mistakes
- Laying sod and then trenching through it for sprinklers
- Building a patio and then finding there is no way to get water or power past it
- Planting a tree where the patio was going to go
- Skipping the grading and ending up with a puddle in the lawn